Yeoman McAlister Architects














Contracting, Yeoman Mcallister, Architects 2005 Oct – 2006 Jan, Roseburn, Edinburgh

3 months contract work at an established Edinburgh practice, producing technical drawings for 2 large scale, high rise housing developments in Edinburgh, Leith and Aberdeen.

Projects:


Ocean Drive, Leith, Edinburgh
Development of a brown field, waterside, (8000 m2/ 86,000 ft2) site in Leith for Cala Homes. Creating 100 luxury flats in 3 high rise blocks sitting upon and connected by a large basement car park. Total floor area 9,800 m2 /105,000 ft2 .Contract value £30m / $52m (approximately). Worked at stage E-G, prepared building warrant application.
























Hilton Campus, Aberdeen, Phase 5
Development of a brown field 96,500 m2/ 1,000,000 ft2 site in old Aberdeen for Cala homes. Final phase 5 development of 12,000 m2 / 130,000 ft2 section of the site with a variety of housing types, including small villa flats, terrace housing, town house and small blocks of flats. Creating of 63 units
with a total floor area of 6000m2 / 65,000 ft2. Worked on the project at stage D-F.
(sorry no images of this project)